EN
1
preparation of fuel for heating
2
placements of wood in the chamber
3
igniting the wood from above
4
stoking
A
closed
B
open – heating at nominal output (optimal operation)
C
open – starting a re position (putting the product into operation)
A
closed
B1
open – heating at nominal output (optimal operation)
B2
open – primary air closed
C
open – starting a re position (putting the product into operation)
S t o r c h k a m i n e
I n s t a l l a t i o n i n s t r u c t i o n s
8 | 28
64/140
VULSINI HE20 EX