ÉNERGIE SOLAIRE
inclu-
lu-
ding codes in your area.
ilding codes in your area.
autorité
torité
obligation
gation
wiring or other hidden
wiring or other hidden
lation
ling.
ion
g.
s cette
ette
service sur l'unité, débrancher les fils
isconnect power leads from
disconnect power leads from
aux
DUAL
r prévenir une opération accidentelle.
ntal operation.
ental operation.
ui varient
varient
hélice est bien serrée et que la vis de
e.
EcoSmart Évent de Pignon
Figure 1b
Figure 1b
en
niquement de la manière prévue
des questions, veuillez contacter les
es
e Master Flow
au 1-800-211-9612.
MD
• Soulever délicatement les bardeaux où les rails supérieurs se
NUT
NUT
BOLT
2005.
05.
fixeront. Déterminer cet emplacement en alignant le châssis du
c conduits doivent toujours être
panneau solaire entre les ailes en forme de "L" installées et en
.
centrant les petites fentes dans les rails avec les trous de montage
SHROUD
dans les ailes en forme de "L". Glisser les rails supérieurs sous les
ation de votre panneau solaire peut
bardeaux soulevés et fixer chaque rail au platelage de toit avec une
celle sur les illustrations. La perfor-
vis de platelage. Relâcher et presser en place les bardeaux (Figure
onfigurations est la même.
4c). Appliquer du bitume de collage sous les bardeaux pour les
MOUNTING
MOUNTING
fixer solidement au toit.
BRACKETS
BRACKETS
• Terminer en fixant les ailes en forme de "L" aux rails avec les
écrous et boulons compris et en les serrant solidement (Figure 4d).
Figure 2b
Courir le fil inclus du panneau solaire au ventilateur de l'évent de
Figure 4c
Figure 4c
pignon au travers d'une ouverture dans la persienne extérieure.
Assurez-vous de faire suivre le fil autour du châssis du ventilateur
de pignon (Figure 6).
5. Ajustement du Panneau Solaire... Lors de l'ajustement du
panneau solaire, assurez-vous de pencher ou d'incliner le panneau
pour en maximiser son exposition directe au soleil. Pour incliner
le panneau solaire, dévisser les deux vis /écrous (Figure 5a) sur
le raccord de montage du rail /la fixation de connexion. Puis,
relever le panneau à la position désirée et resserrer (Figure 5b).
Remarque: L'angle optimal peut se calculer en utilisant la latitude
approximative de la maison plus 20 degrés. Le panneau solaire
doit faire face au Sud si possible.
6. Montage du Module de Contrôle... Retirer le module de
Figure 5a
contrôle de l'emballage interne. Le fixer au rebord du colombage
ou du chevron adjacent au ventilateur (les fils du moteur sont d'une
nt behind an existing gable
ent behind an existing gable
longueur de 24po (61cm) avec les vis à bois (non-comprises) au
er Flow
ster Flow
Gable Louver. The
Gable Louver. The
®
®
travers des trous pré-percés des onglets de montage sur le côté du
module de contrôle. (Figure 6)
ely 3" (7.6cm) to 4" (10.2cm)
3" (7.6cm) to 4" (10.2cm)
7. Câblage...
er.
ver.
• Retirer le couvercle du module de contrôle en soulevant
ets To Unit
kets To Unit
délicatement le couvercle hors des onglets de rétentions sur
les côtés. MISE EN GARDE: La plaquette du contrôle a des
ounting accessories kit from
mounting accessories kit from
composantes électroniques très fragiles.
g kit includes (8) bolts, (8)
ing kit includes (8) bolts, (8)
• Installer un connecteur de type Romex (non-compris) dans
g brackets. Take the mount-
ing brackets. Take the mount-
l'alvéole défonçable de 0.5po (12.7mm) et insérer le câble
align with the 2 holes on the
d align with the 2 holes on the
d'alimentation en provenance de la résidence.
panneau solaire à l'emplacement
d, take 2 bolts with the head
take 2 bolts with the head
• Raccorder les câbles d'alimentation en provenance de la
t que les rails supérieurs s'étendent
and push through each hole.
d and push through each hole.
résidence tel qu'illustré (Figure 7).
o) au-dessus du chevauchement de
sten to each bolt. Repeat this
fasten to each bolt. Repeat this
• Ajuster le thermostat tel que souhaité entre 60 et 120°F (16 et
es en forme de "L", en vous assurant
ng brackets are firmly fastened
brackets are firmly fastened
49°C), nous recommandons 105°F (41°C), le réglage de l'usine
s chaque aile en forme de "L" est au
est de 105°F (41°C).
b).
dans le rail. Utiliser un crayon de cire
• Raccorder la fiche mâle du panneau solaire sur la fiche femelle
le contour des ailes en forme de "L"
du module de contrôle, puis raccorder la fiche mâle sur le
stré à la (Figure 4a).
module de contrôle à la fiche femelle du moteur. (Figure 8)
so end is flush with the stud.
end is flush with the stud.
enter, mounting brackets
center, mounting brackets
• Chaque unité d'Évent de Pignon à Bi-Énergie doit avoir son
montage du panneau solaire compris
propre module de contrôle.
crew or nail unit to framing
semble comprend des vis à platelage,
Screw or nail unit to framing
contre-écrous nylock et (2) ailes en
s in mounting brackets (Figure
n mounting brackets (Figure
panneau solaire à l'emplacement
6cm) on center, install two
0.6cm) on center, install two
nt que les rails supérieurs s'étendent
upports, 14" (35.6cm) apart.
supports, 14" (35.6cm) apart.
Important: Your solar panel configuration may differ
Important: Your solar panel configuration may differ
slightly from the one shown in the illustrations. The
slightly from the one shown in the illustrations. The
performance of all configurations is the same.
performance of all configurations is the same.
CAUTION: THIS UNIT IS FOR GENERAL VENTILATING
CAUTION: THIS UNIT IS FOR GENERAL VENTILATING
AVERTISSEMENT: CETTE UNITÉ EST POUR UN USAGE DE
™
POWERED
USE ONLY. DO NOT USE TO EXHAUST HAZARDOUS OR
USE ONLY. DO NOT USE TO EXHAUST HAZARDOUS OR
VENTILATION GÉNÉRALE UNIQUEMENT. NE PAS UTILISER
POUR VENTILER DES MATÉRIAUX OU VAPEURS EXPLOSIVES
OU DANGEREUSES. CE VENTILATEUR A UNE HÉLICE
Figure 2a
Figure 2a
NON GARDÉE. NE PAS UTILISER DANS DES ENDROITS
FACILEMENT ACCESSIBLES PAR LES GENS OU PAR LES
Figure 4b
Figure 4b
ANIMAUX.
BOLT
Outils Requis
• Perceuse • Trépan de 0.33cm (1/8po) • Couteau Tout Usage
• Tournevis • Égoïne • Gants • Marteau de Charpentier
SHROUD
• Lunettes de Sécurité • Échelle • Crayon ou Marqueur
• Cordon d'Extension • Vis à Bois • Pinces • Tourne Écrous
Figure 3
Figure 4d
Figure 4d
1. Determine Location
1. Determine Location
Place Solar Power Gable Vent behind an existing gable
Place Solar Power Gable Vent behind an existing gable
wall louver or install a Master Flow
wall louver or install a Master Flow
fan should be approximately 3" (7.6cm) to 4" (10.2cm)
fan should be approximately 3" (7.6cm) to 4" (10.2cm)
away from the exterior louver.
away from the exterior louver.
SUD
2. Attach Mounting Brackets To Unit
2. Attach Mounting Brackets To Unit
Carefully remove unit and mounting accessories kit from
Carefully remove unit and mounting accessories kit from
the carton. The fan mounting kit includes (8) bolts, (8)
the carton. The fan mounting kit includes (8) bolts, (8)
Nylok
nuts and (4) mounting brackets. Take the mount-
Nylok
nuts and (4) mounting brackets. Take the mount-
™
™
ing brackets (long side) and align with the 2 holes on the
ing brackets (long side) and align with the 2 holes on the
Figure 5b
Place the solar panel in the desired location, making sure
Place the solar panel in the desired location, making sure
shroud. With holes aligned, take 2 bolts with the head
shroud. With holes aligned, take 2 bolts with the head
that the top rails extend at least 1.5" (3.8 cm) above
that the top rails extend at least 1.5" (3.8 cm) above
on the inside of the shroud and push through each hole.
on the inside of the shroud and push through each hole.
shingle course overlap. Align the "L"-shaped wings
shingle course overlap. Align the "L"-shaped wings
Take the Nylok
Take the Nylok
™
making sure that the bolt hole in each "L"-shaped wing
making sure that the bolt hole in each "L"-shaped wing
process until all 4 mounting brackets are firmly fastened
process until all 4 mounting brackets are firmly fastened
is in the center of the short slot in the rail. Use a grease
is in the center of the short slot in the rail. Use a grease
to shroud (Figure 1a & 1b).
to shroud (Figure 1a & 1b).
pencil or chalk to trace the outline of the "L"-shaped
pencil or chalk to trace the outline of the "L"-shaped
wings on the shingle as shown in (Figure 4a).
wings on the shingle as shown in (Figure 4a).
3. Mounting The Unit
3. Mounting The Unit
Place mounting brackets so end is flush with the stud.
Place mounting brackets so end is flush with the stud.
Note: To Avoid possible weather infilitration, do not place
Note: To Avoid possible weather infilitration, do not place
For studs 16" (40.6cm) on center, mounting brackets
For studs 16" (40.6cm) on center, mounting brackets
the "L"-shaped wings or the top rails on the vertical
the "L"-shaped wings or the top rails on the vertical
are predrilled to this size. Screw or nail unit to framing
are predrilled to this size. Screw or nail unit to framing
spaces between the shingle tabs.
spaces between the shingle tabs.
through pre-punched holes in mounting brackets (Figure
through pre-punched holes in mounting brackets (Figure
solidement au toit. Terminer en fixant les ailes en forme de "L"
2a). For studs over 16" (40.6cm) on center, install two
2a). For studs over 16" (40.6cm) on center, install two
Remove the "L"-shaped wings from the shingles and lay
Remove the "L"-shaped wings from the shingles and lay
aux rails avec les écrous et boulons compris et en les serrant
2" x 4" (5.1cm x 10.2cm) supports, 14" (35.6cm) apart.
2" x 4" (5.1cm x 10.2cm) supports, 14" (35.6cm) apart.
solidement (Figure 4d)
the solar panel aside. At the location traced above, care-
the solar panel aside. At the location traced above, care-
Mount the unit to the two 2" x 4" (5.1cm x 10.2cm)
Mount the unit to the two 2" x 4" (5.1cm x 10.2cm)
fully pry up the shingles and slide each "L"-shaped wing
fully pry up the shingles and slide each "L"-shaped wing
5. Ajuster le Panneau Solaire
supports through the pre-punched holes in the mounting
supports through the pre-punched holes in the mounting
under a shingle and align each wing with a deck screw.
under a shingle and align each wing with a deck screw.
Lors de l'ajustement du panneau solaire, assurez-vous
brackets (Figure 2b).
brackets (Figure 2b).
Release and press the shingles into place (Figure 4b).
Release and press the shingles into place (Figure 4b).
d'incliner le panneau pour maximiser l'exposition directe
Apply roofing cement under the shingles to secure them
Apply roofing cement under the shingles to secure them
aux rayons de soleil. Pour incliner le panneau solaire,
4. Determine Location and Mount Solar Panel
4. Determine Location and Mount Solar Panel
to the roof.
to the roof.
desserrer les deux boulons/écrous (Figure 5a) sur le rail du
Locate solar panel on the part of the roof closest to the
Locate solar panel on the part of the roof closest to the
raccord de montage/fixation. Ensuite, soulever le panneau à
gable fan as possible. Be sure the solar panel faces to
gable fan as possible. Be sure the solar panel faces to
Carefully pry up the shingles where the top rails will attach.
Carefully pry up the shingles where the top rails will attach.
la position désirée et resserrer (Figure 5b).
the south for optimal power. Make sure the location is
the south for optimal power. Make sure the location is
Determine this location by aligning the solar panel frame
Determine this location by aligning the solar panel frame
Remarque: L'angle optimal peut se calculer en utilisant
not shaded by trees or other nearby structures during the
not shaded by trees or other nearby structures during the
between the installed "L"-shaped wings and centering
between the installed "L"-shaped wings and centering
la latitude approximative de la maison plus 20 degrés. Le
day (Figure 3).
day (Figure 3).
the short slots in the rails with the mounting holes in
the short slots in the rails with the mounting holes in
panneau solaire doit toujours faire face au sud, lorsque
NUT
MOUNTING
MOUNTING
BRACKETS
BRACKETS
Figure 2b
Figure 2b
Figure 4c
Figure 4c
Figure 4c
Figure 4a
Figure 5a
Figure 5a
Figure 5a
Gable Louver. The
Gable Louver. The
®
®
Figure 6
Figure 6
nuts and fasten to each bolt. Repeat this
nuts and fasten to each bolt. Repeat this
™
MOTEUR
CONNECTEUR
DE CÂBLER
Figure 7
Figure 7
LIGNE
NEUTRE
MISE À LA TERRE
Screws • Pliers • Nut Driver
NUT
BOLT
BOLT
SHROUD
SHROUD
APPLICATION DES INSTRUCTIONS
Figure 3
Figure 3
Figure 4d
Figure 4d
Figure 4d
Figure 5b
Figure 5b
Figure 5b
Place the solar panel in the de
Place the solar panel in the desir
that the top rails extend at lea
that the top rails extend at least 1
shingle course overlap. Align th
shingle course overlap. Align the
making sure that the bolt hole
making sure that the bolt hole in
is in the center of the short slo
is in the center of the short slot in
pencil or chalk to trace the out
pencil or chalk to trace the outlin
wings on the shingle as shown
wings on the shingle as shown in
Note: To Avoid possible weath
Note: To Avoid possible weather
the "L"-shaped wings or the to
the "L"-shaped wings or the top
spaces between the shingle ta
spaces between the shingle tabs
Note: The optimum angle can b
approximate latitude of the hou
Remove the "L"-shaped wings
Remove the "L"-shaped wings fro
solar panel should face south,
the solar panel aside. At the lo
the solar panel aside. At the locat
fully pry up the shingles and s
fully pry up the shingles and slide
6. Connect Solar Panel to Gab
under a shingle and align each
under a shingle and align each wi
Run included wire from solar p
Release and press the shingles
Release and press the shingles int
PERSIENNES
d'ÉVACUATION
through an open slot in the ext
Apply roofing cement under the
Apply roofing cement under the sh
route the wire around the gable
to the roof.
to the roof.
FILER VERS LE
motor (Figure 6). Complete co
PANEAU SOLAIRE
fastening the two ends of the w
Carefully pry up the shingles wh
Carefully pry up the shingles wher
Determine this location by alig
Determine this location by alignin
CAUTION: THIS FAN AUTOMAT
between the installed "L"-shap
between the installed "L"-shaped
WHENEVER A LIGHT SOURCE S
the short slots in the rails with
THERMOSTAT
the short slots in the rails with th
PANEL. ALWAYS EXERCISE CAU
the "L"-shaped wings. Slide th
the "L"-shaped wings. Slide the t
VICINITY OF THE FAN.
shingles and attach each rail t
shingles and attach each rail to th
screw. Release and press the
screw. Release and press the shi
Notice: If parts and/or accesso
4c). Apply roofing cement und
4c). Apply roofing cement under
product does not operate corre
them to the roof. Finish by atta
them to the roof. Finish by attach
Technical Services. Do not retu
wings to the rails with the bolt
wings to the rails with the bolts a
distributor.
tighten them securely (Figure
tighten them securely (Figure 4d
VIS DE MISE À
LA TERRE
5. Adjust Solar Panel
5. Adjust Solar Panel
When adjusting the solar pane
When adjusting the solar panel, b
to maximize direct exposure to
to maximize direct exposure to th
Screws • Pliers • Nut Drive
PROD
Garantie
GAF Materi
l'acheteur d
Master Flow
rembourser
produits de
pas correct
La période d
des travaux
Flow
MD
SOUTH
SOUTH
électrique M
est transféré
ci-dessous).
Recours
Produit
Ventilateur
PR1D, CPR1
PR2D, CPR2
PRSOLAR1,
PR3XD, PR3
Ventilateur
CPG2, PG2
PGSOLAR1
PG3X, PG3H
Note: The optimum angle ca
approximate latitude of the h
Ventilateur
solar panel should face south
WHFTAN1
30BWHFS,
6. Connect Solar Panel to G
Run included wire from solar
through an open slot in the e
Pour tout p
route the wire around the ga
qui ne fonc
motor (Figure 6). Complete c
fabrication,
fastening the two ends of the
ment. Si vo
protection L
CAUTION: THIS FAN AUTOMA
des frais ra
WHENEVER A LIGHT SOURCE
PLAQUETTE DE
du produit d
CONTRÔLE
PANEL. ALWAYS EXERCISE C
et tout autr
VICINITY OF THE FAN.
remplacem
struction), c
Notice: If parts and/or acces
prix de déta
product does not operate cor
de la répara
Technical Services. Do not re
sivement pa
distributor.
disponible u
électrique M
au moment
11
et tout prod
Master Flow
Figu
F
Fi
Figu
et se
Fig
F
WIRE
W
CONN
C