Télécharger Imprimer la page

MONDELIN EasyLev Plus Notice D'instructions page 21

Publicité

1. Transport from a building site to the next one
In order to make transport from a building site to the next one easier, the plasterboard lifter is broken down
into 2 elements:
The frame equipped with 2 rollers at the bottom of the column makes transport easier
-
The head and beam assembly
-
Weight of the various elements :
Frame (equipped with 2 transport
rollers)
Head and beam
The shape given to the transport handle on which the winch is fixed enables also the operator to carry the frame
assembly on the shoulder.
2. Transport on the building site
The panel lifter has 3 Ø100 braked wheels.
The transport handle on which the winch is fixed enables the operator to guide the plasterboard lifter
The metallic parts must be separated from the plastic components in order to ensure recycling in accordance with the
regulations in force.
This appliance is guaranteed against manufacturing defects for a period of 5 years from the date of purchase, as
shown on the retailer's invoice.
For this guarantee to apply, the instructions given in the manual must be scrupulously followed.
Damage caused by normal wear and tear: wheels, pulleys, cables, winch, arm shoes with springs, arm pads, or
abnormal use or maintenance or overloading are excluded from the guarantee.
Failure to use the EASYLEV PLUS for purposes other than those for which it was designed, i.e. horizontal
plasterboard installation on ceilings and under crawl spaces, will not be covered by the warranty.
21.5 Kg
10 Kg
21

Publicité

loading

Ce manuel est également adapté pour:

513500