Télécharger Imprimer la page

ABB Steel City RPT6 Serie Instructions D'installation page 5

Masquer les pouces Voir aussi pour Steel City RPT6 Serie:

Publicité

6.0 Install Poke-through body into hole:
6.1 Poke-through CANNOT be rotated or removed after insertion into hole.
Confirm correct orientation of devices before installing the floor box into
the floor hole (See Figure 14).
6.2 IMPORTANT! If flexible conduit is used, electrical connections can be made
before inserting Poke-Through into hole. Flexible conduit MUST be
connected to bottom junction box plate with appropriate conduit hub
(See Figure 15). Install electrical devices in accordance with the
instructions supplied with those products.
6.3 Insert Poke-Through into hole and push down until TOP RIM contacts the
concrete floor. (See Figure 16).
CAUTION:
• Poke-Through CANNOT be rotated after insertion
into the hole. Verify the 3 gangs are in the desired
orientation before inserting the unit into the hole.
Figure 14
IMPORTANT, see step 6.1
Figure 15
Three Gangs
Figure 16
5 of 24 - ENGLISH
Top of Rim
Carpet, Wood,
Tile or Linoleum
Floor
Top of Concrete
Floor

Publicité

loading