Télécharger Imprimer la page

Dometic LSE 105 BF Instructions De Montage Et De Service page 18

Masquer les pouces Voir aussi pour LSE 105 BF:

Publicité

EN    
3. Connect the battery charger.
4. Connect the display and additional consumers (optional).
Sequence when disconnecting:
1.
Disconnect the display and additional consumers.
2. Disonnect the battery charger.
3. Disconnect the solar panel from the solar charge controller.
4. Disconnect the solar charge controller from the batteries.
Related documents:
Find the information on installing the solar charge controller (SCE 320, SCE 320B, SCE 360,
SCE 360B) online at https://documents.dometic.com/?object_id=87660.
Find the information on installing the battery charger (PSB 12-40, PSB 12-80) online at
https://documents.dometic.com/?object_id=87813.
Find the information on installing the display (DTB01) online at
https://documents.dometic.com/?object_id=87609.
18

Publicité

loading