Télécharger Imprimer la page

Dometic LSE 105 BF Instructions De Montage Et De Service page 16

Masquer les pouces Voir aussi pour LSE 105 BF:

Publicité

EN    
Connecting the solar charge controller (accessories)
Observe the following instructions when connecting the solar charge controller:
• Connect the house battery before connecting the solar panel.
• Connect several solar panels only in parallel and up to the rated power of the solar charge controller.
• In the case of two or more batteries, parallel connection is permissible if the batteries are of the same type,
capacity and age. Connect the batteries diagonally.
• Also observe the instructions and safety precautions for the solar charge controller used.
Related documents:
Find the information on installing the solar charge controller (SCE 320, SCE 320B, SCE 360,
SCE 360B) online at https://documents.dometic.com/?object_id=87660.
16

Publicité

loading