Installation
Equipment Description
This product is intended for use as an optional residential
generator system which provides an alternate source
of electric power and to serve loads such as heating,
refrigeration systems, and communication systems that,
when stopped during any power outage, could cause
discomfort or inconvenience. This product does not qualify
for emergency standby as defined by NFPA 70 (NEC).
Home Owner Responsibilities
• Read and follow the instructions given in the Operator's
Manual, especially the section regarding selecting
essential circuits.
• Follow a regular schedule in maintaining, caring for
and using your residential generator, as specified in the
Operator's Manual.
Installing Dealer/Contractor Responsibilities
• Read and observe the safety rules.
• Install only an UL approved transfer switch that is
compatible with the generator.
• Read and follow the instructions given in this
Installation and Start-up Manual.
IMPORTANT: The system is equipped with a water heater
that is activated when ambient temperature is less than 80°F
AND utility power is present at the transfer switch.
If you need more information in this matter, please call
(877) 369‑9400 between 8:00 AM and 5:00 PM CT.
Unpacking Precautions
The unit is shipped ready for installation on a prepared
reinforced cement slab or engineered base. Avoid
damage from dropping, bumping, collision, etc. Store and
unpack carton with the proper side up, as noted on the
shipping carton.
Delivery Inspection
After removing the carton, carefully inspect the generator for
any damage that may have occurred during shipment.
IMPORTANT: If loss or damage is noted at time of
delivery, have the person(s) making delivery note all
damage on the freight bill and affix his signature under the
consignor's memo of loss or damage. If loss or damage is
noted after delivery, separate the damaged materials and
contact the carrier for claim procedures. Missing or damaged
parts are not warranted.
Shipment Contents
The generator system is supplied with:
• Residential generator
• Fully-serviced coolant system
• Fully-serviced oil/lubricating system
• 650 CCA starting battery
• Flexible fuel hook-up hose
• Installation and start-up manual
• Operator's manual
• Engine operator's manual
• Installation checklist
• Two access door keys
• One spare 15A fuse
• 10 Pole control panel connector
• Remote LED indicator kit (red LED/plate/screws)
Not Supplied:
• Mounting pad
• Connecting wire and conduit
• Fuel supply valves/plumbing
Required Specialty Tools/Equipment
• Two 60" lengths of 2" Schedule 40 pipe (NOT conduit)
• Crane, lifting straps, chains or cables
• Hole punches for 7 ga steel
• Torque screwdriver, 5 to 50 inch-pound range
• Voltage/frequency meter
• Ignition timing light (if converting fuel type)
• Air Fuel Ratio Meter (O2 Sensor and Analyzer, if
converting fuel type)
• Dummy load (if converting fuel type)