Télécharger Imprimer la page

Reese 30183 Instructions D'installation page 7

Publicité

Pickup Bed Installation
1.
Install pickup bed
Ensure the locating bolts shown in Figure 8 are properly installed to both the pickup frame and
pickup bed to prevent misalignment.
2.
Tighten the eight bolts to 129 ft-lbs (175 Nm).
FIGURE 8
3.
Install the fuel filler pipe and tighten to 44 in-lb (5 Nm).
4.
If equipped, install the urea filler pipe and tighten to 22 in-lb (2.5 Nm).
5.
Reconnect the LH and RH wire harnesses.
6.
Install the tailgate onto the pickup bed.
7.
While inside the pickup bed, inspect the fifth wheel hitch for proper puck placement.
Puck grooves should sit above the drilled holes.
There should be a minimum 0.039" (1mm) clearance between the pucks and holes in the pickup bed.
FIGURE 9
8.
Clean any debris from pickup bed
9.
Check the vehicle exterior lighting for proper operation.
©
2024 Horizon Global Corporation
Page 7 of 27
Printed In Mexico
30183N
07/23/2024
Rev. A

Publicité

loading