Télécharger Imprimer la page

Mirolin SABLE CF2012 Instructions D'installation page 4

Publicité

STEP 7: Lift the tub back into the correct position, levelling
the tub if necessary (tub levelled at factory). Level by
loosening the hex nut and threading the rod into or out of
the block. Tighten the hex nut against the wood block once
the foot is level. Connect the plumbing once the tub is
level.
ROD
We want you to be completely satisfied with our products and service. If you have any comments or
The company reserves the right to change models and specifications without notice.
HEX NUT
suggestions, please call 1-800-MIROLIN toll free.
STEP 8:
Finish the installation by running a bead of high
quality silicone around the outside of the bathtub, where
the bathroom floor meets the bathtub apron.
R0084050
4
15 Aug. 2017

Publicité

loading

Ce manuel est également adapté pour:

Demi cf2007