Télécharger Imprimer la page

Mirolin PARKER PT520L/R Directives D'installation Et Guide D'utilisation

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

INSTALLATION INSTRUCTIONS AND OWNER'S MANUAL
READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION
PLEASE RECORD THE SERIAL NUMBER _________ OF YOUR TUB SHOWER
Important:
The Acrylic Tub Shower was carefully inspected
and packed for shipment. You should check your unit and if there
are any problems, contact your dealer before installation.
Protect the tub shower from dirt and damage by leaving the
polyethylene protective film in place until installation and other
related construction are complete.
1 PC FRAME
3 PC FRAME
TOOLS AND MATERIALS REQUIRED
Tools: Tape Measure, Electric Drill, Drill Bit (3/16"),
Level, Hole Saw and Caulking Gun
Materials: Mildew Resistant Silicone Bathroom
Caulking, Drywall Screws and Shims (if required).
CAUTION:
Assembly and installation of this shower unit requires
2 persons.
To cut plumbing fixture openings on the tub shower unit:
"
Use correct size hole saw based on selected fixture
design.
"
Cut from the finished side of the unit.
"
Use masking tape to mask the surrounding surface to
prevent scratches and other damages.
©
Copyright 2010
Mirolin Ind.
PARKER
PT520L/R, PT516L/R - TUB SHOWER
SAVE THIS MANUAL FOR FUTURE REFERENCE
-
FIGURE 1
LAYOUT
DIMENSIONS
The Copyright includes all content on the document
mirolin.com
General Installation Notes
Note: Dimensions are clear openings. Refer to specification
sheet for dimensions of shower unit.
"
The Tub Shower is to fit into formed recess as shown in
Figure 1 and Figure 2.
"
Clear opening is required with the flange outside of the
opening: 1 PC - 57 ½" x 88 ½"; 3 PC- 57 ½ "X84 ½"
"
Rough- in dimensions: 1PC- 60"x90"; 3PC- 60"x86"
"
Framing:
Inside dimension of the studded alcove are to be as
specified in Figure 1.
"
Follow Figure 2 as specified to ensure width is 57 ½"
between the 2" x 2" recessed studs. (See detail view.)
Shimming May Be Required
"
The unit will rest on the front edge and the two legs at the
rear of the unit. Shims may be required to level the tub to
ensure adequate drainage. Insert the bottom section in the
alcove and shim accordingly. Then remove and assemble
as per instructions.
"
The shower is fastened in place using dry wall screws.
Holes are to be drilled in the flange on both sides and
across the top. The holes are to be drilled by the installer,
installation is illustrated in figures 3 and 3A.
"
If there is a gap at the seam on the front post, then shim the
flange as illustrated in Figure 3B.
2" x 4"
WOOD BLOCK
DRYWALL
8 ½"
216 mm
60 ½"
1537 mm
FIGURE 2
.
2" X 2"
WOOD BLOCK
DRYWALL
SCREW
3/8
"
TUB FLANGE
57 ½"
1461 mm
1

Publicité

loading

Sommaire des Matières pour Mirolin PARKER PT520L/R

  • Page 1 Cut from the finished side of the unit. 1461 mm 60 ½” " Use masking tape to mask the surrounding surface to 1537 mm prevent scratches and other damages. FIGURE 2 © Copyright 2010 Mirolin Ind. The Copyright includes all content on the document...
  • Page 2 FIGURE 3A STUD FIGURE 3B SHIM FIGURE 3 - FASTENING WITH DRYWALL SCREWS Remove the protective film from the tile flange before fastening. FIGURE 4 - DRYWALL FINISHING SNAP-FIT SYSTEM ASSEMBLY INSTRUCTIONS NOTE: To the Installer - Please remove all the shims from the Snap Fit extrusions of the unit prior to installation. The Parker Tub Shower should be pre-assembled first prior to alcove installation.
  • Page 3 " Carefully position the Tub Shower into the framing and push flush against the framework walls. Mirolin Industries Corp. is not responsible for any " damages incurred as a result of poor installation of the Install the drain according to the manufacturer’s product.
  • Page 4: Pt516G/D - Douche/Baignoire

    Coupez du côté fini de l'unité. Employez le ruban pour masquer la surface environnante pour empêcher des 57 ½ po éraflures et d'autres dommages. 1460 mm 60 ½ po 1537 mm © Copyright 2010 Mirolin Ind. Le Copyright comprend tout le contenu de ce document...
  • Page 5 ILLUSTRATION 3A montant cale ILLUSTRATION 3B ILLUSTRATION 3 - FIXATION DU VIS DE CLOISON SÈCHE Retirer le film protecteur du rebord pour carreaux de céramique avant fixation. ILLUSTRATION 4 - FIXATION DU CLOISON SÈCHE DIRECTIVES D’INSTALLATION DU SYSTÈME SNAP-FIT NOTE : A l'Installateur - enlève s'il vous plaît tous les cales de support du Claquement les extrusions Capables de l'unité avant l'installation.
  • Page 6: Entretien

    Positionner le bain-douche dans le logement et le " pousser contre les murs de l’encadrement. Mirolin Industries Corp. n'assume aucune responsabilité en cas Poser le drain selon les directives du fabricant. Utiliser " de dommages résultant d'une mauvaise utilisation du produit.

Ce manuel est également adapté pour:

Parker pt516l/r