1.Hang the receptacle box of the special cable/receptacle on the front
handle pipe of unit (A) or unit (B), and tie the longer cable of the
special cable/receptacle to the front handle pipe of the other unit
with the cable strap.
2.Connect the special cable/receptacle for parallel operation to the two
generators.
• Place two generators at least 1 meter (3 feet) away from each
other during parallel operation.
• Take care not to slacken the wire toward the starter grip side.
• Connect the longer wire to the generator on which the special
cable/receptacle for parallel operation is not installed.
• Do not set the generators with the exhaust side face to face each
other.
FRONT
HANDLE PIPE
SPECIAL CABLE/
RECEPTACLE FOR
PARALLEL
OPERATION
UNIT (A)
RECEPTACLE BOX
UNIT (B)
CABLE STRAP
37