Télécharger Imprimer la page

Stanley DUBUIS BGH700 Manuel D'utilisation page 22

Publicité

Les langues disponibles

Les langues disponibles

MAINTENANCE
English
CONTROL OF RELEASING PRESSURE:
It is performed with the gauge PtNb82812
.
The group must be checked every year, to be sure that it indicates the right pressure. This check can be done by DUBUIS
Company.
For this test, read the instructions manual supplied with the gauge.
FILLING UP OF THE TANK:
Observe an extreme cleanliness for the oil and for the parts in contact with the oil. Impurities are causes of malfunction.
Advised oil: TOTAL EQUIVIS XV32
Remove the battery.
Place the group on a stable surface.
Unscrew the cap from the filling hole of the tank with 22mm wrench.
Filling cap
EQUIVIS XV32 oil
Fill the tank up with the advised oil.
The level is reached when the oil reach the filling hole threading.
Screw the filling cap.
Note: in case of tank overfilled, oil overflowing when opening the tank cap is normal.
0215 - BGH700 - 22

Publicité

loading