Télécharger Imprimer la page

Tripp-Lite SmartOnline SU80K Manuel Du Propriétaire page 15

Publicité

Les langues disponibles

Les langues disponibles

6 – Wiring
6-7 AC Input/Output Wiring (Single UPS)
After de-energizing all input and output (AC and DC) of the UPS
1
system, remove the terminal block cover from the UPS system.
If you did not connect the ground cable in
2
UPS system's grounding terminal
B
with a 4 AWG (5.189 mm) ground cable. Keep the ground cable
connected at all times after installation.
Remove the UPS system's front bezel to expose the circuit breaker.
3
First, confirm that the main input circuit breaker switch
the bypass input circuit breaker switch
confirm that the manual bypass circuit breaker switch
Third, confirm that the output circuit breaker switch
Confirm the phase of each cable, then connect the cables according
4
to the UPS system terminal block diagram in
Section 6-5
for cable size requirements. Cabling should be
protected by flexible conduit and routed through the appropriate
knockouts in the terminal block cover. Warning: Observe proper
phase by connecting R to R, S to S, T to T and N to N. Failure
to observe proper phase will damage the UPS system and
create a risk of personal injury and property damage.
Replace the UPS system's terminal block cover.
5
200803004 93-2793 SU80k manual 4C.indd E15
200803004 93-2793 SU80k manual 4C.indd E15
All manuals and user guides at all-guides.com
(continued)
Section
6-6, connect the
A
to your facility's earth ground
are both off. Second,
B
D
Section
1
B
2
A
and
is off.
C
O
is off.
OFF
Main
Input
A
Front Panel
3
6-3. See
4
5
15
A
O
O
OFF
OFF
B
C
Back Panel
1
2
3
4
5
6
O
7
OFF
8
D
9
10
11
12
13
6/16/2008 1:43:19 PM
6/16/2008 1:43:19 PM

Publicité

loading