Télécharger Imprimer la page

Penguin FLORENCE Manuel D'instructions page 32

Publicité

Les langues disponibles

Les langues disponibles

Slide the vertical guides Vv-3 left and Ww-3 right into the 2 ends of the frames along the grooves, shaking while sliding
for easier movement. Next, slide two (2) Yy-3 and Zz-3-L from left side to right on top of the frame. The groove should
be towards the interior of the unit. Repeat from right side with two (2) YY-3 and Zz-3-R and space evenly.
Zz-3-L
STEP #3
Slide brackets O-3 into ML-3 and MR-3 in equal quantity.
Then join ML-3 and MR-3 using N-3. Once assembled lift the
assembled wall track and position it above the vertical wall guides
Vv-3 and Ww-3 (approximate 96" from the ground).
Secure the wall track (ML-3, MR-3) and vertical wall guides (Vv-3
and Ww-3) to the wall by drilling holes through the aluminum, at
32
Zz-3-R

Publicité

loading

Produits Connexes pour Penguin FLORENCE

Ce manuel est également adapté pour:

W1209-gp-12W1209-gp-32