Télécharger Imprimer la page

Miele PDR 922 HP Mode D'emploi Abrégé page 153

Sèche-linge professionnels
Masquer les pouces Voir aussi pour PDR 922 HP:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Then firmly screw on the tumble dryer lid.
a
Tumble dryer
Installation
Place the heat-pump dryer on a totally level, secure and horizontal surface that is able to
withstand the specified floor load.
The floor load created by the heat-pump dryer is concentrated and transferred to the in-
stallation footprint via the machine feet. A base is not required. However, an uneven floor
surface must be compensated for.
Place the heat-pump dryer as close as possible to a cold water connection so that you
can easily clean the heat exchangers with a hose, if required (water pressure up to a
maximum of 4 bar is permitted).
y
906 mm
b
Heat-pump
x
1400 mm
z
PDR 914: 1210 mm / PDR 918: 1413
mm / PDR 922: 1522 mm
en - Installation
153

Publicité

loading