OPERATING INSTRUCTIONS
HOW TO INSTALL INTEGRATED PANEL
MODEL SPRWC052D3SS-P
1. Fully open door.
2. Starting at corner, pull gasket away from door. See Fig A.
3. Continue to pull gasket free from gasket channel.
4. Upon removal, lay gasket down on a flat surface.
5. Secure integrated panel to door using clamps. A robust tape may also be used. It is recommended to
use bar clamps to secure the panel to the door. If using tape, ensure the tape will not damage the panel
finish upon removal. See Fig B.
6. Using a 7/64" (3mm) drill bit, drill 6 pilot holes into the wood panel 1/2" (12mm) deep using the
holes in the door frame as a guide.
NOTICE
It is important to ensure that all drill holes are drilled to the correct depth in order to avoid splits in the
wood when hardwood is installed.
7. Locate 6 of the ST4x 25mm screws provided with your unit.
8. Using a Phillips screwdriver, place one screw into each of the 6 pilot holes and screw down. Do not
over tighten the screws. See Fig C.
9. Ensure the screws sit flush against the bottom of the channel. Remove clamps from the door.
NOTICE
If panel requires additional adjustment after removing clamps, slightly loosen each screw and adjust panel
as necessary. Tighten screws upon completion.
10. Starting at the corners, re-install the gasket into the gasket channel in the frame. Make sure the gasket
is fully seated.
14