Télécharger Imprimer la page

Inca Metal Cutting The Emerson 48ST Instructions D'installation Et D'utilisation page 27

Publicité

Termination above Roof
Consult local codes for minimum vent cap height above the roof (X), vent must be a minimum of 2' from any
wall.
4" x 6" Termination Cap
To prevent water seepage; install the flashing with upper portion under the roofing material and the lower
portion over the roofing material.
Note: Do not fasten down until the final adjustments to the vent have been made.
The diagram at right shows the
minimum clearances as per the
chart on page 28.
3.00
12.00
Page 27 of 49

Publicité

loading

Ce manuel est également adapté pour:

Bonaparte 48