Vertical Installations
Always maintain a 1" clearance around the vent pipe (vertical) and 1" clearance horizontal, when passing
through ceilings, walls, roofs, enclosures, attic rafter or any combustible surfaces.
DO NOT PACK AIR SPACES WITH INSULATION
NE PAS PACK ESPACES D'AIR AVEC ISOLATION
When passing through a flat ceiling install a Box/Wall thimble. Cut a 9" square hole and frame as shown in
the diagram below.
9" x 9" opening
ALWAYS CHECK YOUR LOCAL CODES BEFORE INSTALLING VENTING. CLEARANCES ETC,
MAY VARY FROM STATE TO STATE (PROVINCE TO PROVINCE).
TOUJOURS vérifier les codes locaux avant l'installation VENTILATION. ETC DÉGAGEMENTS, peut
varier d'ÉTAT (PROVINCE).
CONSULT PARTS LIST FOR PART NUMBERS.
CONSULTER LA LISTE DES PIÈCES DE NUMÉROS DE PARTIE.
Page 26 of 49