Procedure:
The device should not be installed in areas where persons may walk by or be seated. If UV-tubes are to be
installed in public areas, then devices with a protective grille must be used.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the device. If you lack these qualifications, do not attempt the installation yourself,
but instead use a professional structural rigger. Improper installation can result in bodily injury and.or
damage to property.
The device has to be installed out of the reach of people.
If the device shall be lowered from the ceiling or high joists, professional trussing systems have to be used.
The device must never be fixed swinging freely in the room.
Caution: Devices may cause severe injuries when crashing down! If you have doubts concerning the safety
of a possible installation, do NOT install the device!
Before rigging make sure that the installation area can hold a minimum point load of 10 times the device's
weight.
The device must be installed in an absolutely horizontal position.
Always install the device via all fixation holes.
Do only use appropriate screws and make sure that the screws are properly connected with the ground.
Before taking into operation for the first time, the installation has to be approved by an expert!
Procedure:
Step 1: On the baseplate, there are holes for the installation.
Step 2: Hold the baseplate onto the location where the device is to be installed.
Step 3: Mark the boreholes with a pen or a suitable tool.
Step 4: Drill the holes.
Step 5: Install the device.
OPERATION
After you connected the device to the mains, the UV-tube lamp needs 3-4 minutes warm-up time until it
reaches full lighting output.
CLEANING AND MAINTENANCE
The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.
The following points have to be considered during the inspection:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
DANGER TO LIFE!
15/31
51101450_V_1_1.DOC