INSTALLATION INSTRUCTIONS
Step 2: Door Insert Panel Installation
2a. The door panels are reversible.
2b. The doors of this unit are shipped with the
trim facing the front of the unit. You can keep
the doors as they are, or reverse the insert
panel with the flat panel forward, depending
on the desired configuration.
Step 3: Adjustable Level.
3.
In case of uneven floors, floor levelers are
provided at the bottom of the vanity.
If necessary, adjust floor levelers by hand to
correct tilting and/ or level doors.
All manuals and user guides at all-guides.com
4
2
3