Mitsubishi Electric CITY MULTI PURY-P72ZKMU-A Manuel D'installation page 20

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Keep the flame out of contact with the cables and metal sheet when brazing the pipes.
- Failure to do so may result in burnout or malfunction.
Braze the pipes with a nitrogen purge to avoid oxidation.
- Oxidized flux inside the refrigerant pipes will cause the refrigerant oil to deteriorate and cause the compressor to
malfunction.
9-5-1. Removing the pinched connecting pipes
When shipped, a pinched connecting pipe is attached to the on-site high-pressure and low-pressure valves to prevent gas leakage.
Take the following steps ① through ④ to remove the pinched connecting pipe before connecting refrigerant pipes to the outdoor unit.
① Check that the refrigerant service valve is fully closed (turned clockwise all the way).
② Connect a charging hose to the service port on the low-pressure/high-pressure refrigerant service valve, and extract the gas in the pipe
section between the refrigerant service valve and the pinched connecting pipe.
③ After vacuuming gas from the pinched connecting pipe, sever the pinched connecting pipe at the location shown in the figure below and drain
the refrigerant.
④ After completing ② and ③ heat the brazed section to remove the pinched connecting pipe.
P72,P96
<B>
<A>
E
D
A
G
F
<A> Refrigerant service valve (low-pressure side/brazed type)
<B> Refrigerant service valve (high-pressure side/brazed type)
Shaft
Fully closed at the factory, when connecting the piping, and when vacuuming. Open fully after
these operations are completed.
<When opening>
<When closing>
Shaft
Fully closed at the factory, when connecting the piping, and when vacuuming.
Open fully after these operations are completed.
<When opening>
<When closing>
Stopper pin
Prevents the shaft from turning 90°or more.
Service port
Available for gas venting of the pinched connecting pipe, or vacuuming in the refrigerant pipes
on the site.
Cap
Remove the cap before operating the shaft. Be sure to return it to the original position after
completing the operation.
Pinched connecting pipe severing portion
Pinched connecting pipe brazing portion
WT07828X01
P120,P144
D
<B>
<A>
B
A
O
S
C
D
E
G
F
GB-18

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Table des Matières