4
5
1
6
13 mm
6
> 2 min
2
English
Turn the water on.
Flush the line for at least two minutes.
Install the flanged nuts on the studs so that they
are 2¼" above the finished surface of the ceiling.
Push the housing into the ceiling.
Install the nuts and washers.