Télécharger Imprimer la page

Kverneland Optima TFprofi Mode D'emploi page 9

Publicité

Preparations
Requirements for
assembly
Screw connections
Tightening torques,
general
Follow the machine operating manual
In addition to these instructions, follow the machine operating
instructions.
This prevents false operation and damage.
Before assembly begins, the following requirements must be met:
The machine is on a flat surface and is secured against rolling away
The electrical system is deactivated
The hydraulic system is deactivated
The hydraulic lines are depressurised
Retightening bolts
After the first hours of operation, all bolts must be checked and
tightened if necessary.
Screw connections might have come loose due to vibrations.
Tighten all screw connections using the information provided in the
table. If different tightening torques are required, they are specified
accordingly. The minimum quality of the bolts is "8.8".
The table can be found on page 18.
Preparations
EN-US
9

Publicité

loading

Ce manuel est également adapté pour:

Wk6pd2vb1