2 COLUMNS ASYMETRIC POST LIFT
PE 2000T
WITH BASEMENT 400V 4T
POWER CONNECTION:
The three-phase connection power cables - 5 poles (5 × 2.5mm2) have to be connected to the
L1 #, L2 # L3 # and N # terminals, located inside the control box.
The PE earth cable must be connected to the marked terminal.
If the lift is operated at 230V, connect L3 #, N # to the terminals located inside the control unit.
The PE # ground cable must be connected to its marked terminal.
CONNECTING THE ELECTROMAGNETIC RELEASE DEVICE:
Connect the 230 # and 200 # steel cables to the cables
marked with the same identification number, inside the
control unit.
CONNECTION OF THE END SWITCH DEVICE:
Connect the 102 # and 100 # cables to the cables marked
with the same identification number, inside the control
unit.
CALIBRATION
1 CALIBRATION PROCEDURE
Check that the power supply connection is correct, and pay attention to the rotation of the
three-phase motor.
Make sure that all the dowels are tight.
Verify that, by pressing the «UP» button, the electromagnets release the mechanical safety lock
and that the carts are aligned and lifted simultaneously
Press the «DOWN» button and check that the electromagnets release the safety devices and
consequently allow the lowering of the carts to the minimum height position.
40
Picture 12
(end switch connection)