Télécharger Imprimer la page

Bosch SMU 20 Serie Instructions D'installation page 5

Publicité

Les langues disponibles

Les langues disponibles

Tools
you will need
Tape measure
Spirit level
Flat blade screwdriver
Phillips screwdriver
Torx screwdriver
Open-ended wrench
(SW 10 mm, 13 mm)
Pipe wrenches (2)
(if galvanized or iron fittings
are used)
Adjustable wrenches (2)
(If copper fittings are used)
Wire cutter
Wire stripper
Electric drill
1" drill bit or hole saw
I,
J®l
Hammer
Materials
you will need
Min 3/8" OD Copper tubing of sufficient length for your installation.
Shut-off valve and fittings for water supply line.
1 compression nut, 1 compression sleeve, 1 90 ° compression elbow
(3/8" NPT one end).
5/8" ID Heat and Detergent Resistant Rubber Hose and Clamps
(to accomodate drain line).
120 Volt 60 Hz, 15 Amp, 2 Wire with ground, Properly Grounded,
Branch Circuit.
I/2" Strain Relief Bushing for Electrical Supply Cable.
5

Publicité

loading

Ce manuel est également adapté pour:

Smu 40 serieSmu 70 serie