14
5.0 FINISHING
EN
POWER SUPPLY SERVICE MUST BE COMPLETED PRIOR TO FINISHING TO AVOID
HEAT VENTS AND AIR OPENINGS CANNOT BE COVERED IN ANY CIRCUMSTANCES.
5.1
NEFI24H LOG PLACEMENT
1
Place the logs shown on the location
dimples on the burner platform.
3
Place log (#2) onto the pin. Ensure
the log is secure onto the pin, as
5.2
NEFI27H LOG PLACEMENT
1
Place the logs shown on the location
dimples on the burner platform.
W415-1461 / C / 08.04.16
!
RECONSTRUCTION.
#2
NEFI24H
shown.
WARNING
2
Place the log (#1) onto the pin.
Ensure the log is secure onto the
2
PIN
NEFI27H
Place log (#1) onto the pin. Ensure the log
is secure onto the pin, as shown.
PIN
#1
pin, as shown.
NEFI24H
PIN
#1