Télécharger Imprimer la page

Star Progetti STAR BRUMA Mode D'emploi page 25

Publicité

Les langues disponibles

Les langues disponibles

DIAGRAM 2
Diagram 2
Six-pin plug
Three-pin plug
Step 3: Electrical connection and water pipe connection
A. Refer to image 3. Insert the 4-pin plug of the power cable into the 4-pin socket at the bottom of the pole-
support. Place them on the pole-support after the connection.
b. Insert the blue tube and the black tube into the round hole of the front cover of the pole-support. Make
sure that the pipes in the pole-support do not bend
c. Refer to photo A. Insert the blue tube coming from the hole in the center cover into the top connector of
the UV sterilizing device .
d. Refer to photo B. Insert the second blue tube into the bottom connector of the UV sterilizing device on
one side and into the water pump connector on the other
is. Make sure that the connection of the blue pipes is done as in photo C.
f. Mount the front panel on the support pole and fix it with screws.
DIAGRAM 3
Diagram 5
Front cover
Water pump connector
Four-pin plug
Blue tube
Misting Switch
UV Lamp Switch
Side panel
Tube connector
Front cover
Blue tube
Water pump
connector
25
Tube
connector
Caution: The water pump
power cord should be
located at the top of the
fan power plug.
Black tube

Publicité

loading

Produits Connexes pour Star Progetti STAR BRUMA

Ce manuel est également adapté pour:

Fre326n