Télécharger Imprimer la page

Health O Meter Professional 499KL Mode D'emploi page 200

Masquer les pouces Voir aussi pour Professional 499KL:

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY INSTRUCTIONS (CONTINUED)
3. Locate the load cell connector
cable inside column A. While
holding column B, slide the
cable through the center
opening at the top of column
B. Push the cable all the way
through Column B until the
plug reaches the bottom of the
column.
4. Align column A and column B.
Notches are located at the
bottom of column A and the
top of column B. Snap the
locking tab into place. Ensure
that the locking tab is locked
securely into place. Note:
When aligning and locking
the columns, use caution
not to pinch the load cell
connector cable.
UM499KL 20190430
Column B
(top)
Column B
(top)
Load cell
connector
cable
Column B
(top)
Notches
Locked position
200
Back to Home Page
Column A
(bottom)
Load cell
connector
cable
Column B
(bottom)
Column A
(bottom)
Locking tab

Publicité

loading