Télécharger Imprimer la page

Publicité

Liens rapides

AL/23
Instructions / Instructions De Montage / Instrucciones
ART. B717BU
ART. B719BU

Publicité

loading

Sommaire des Matières pour Fantini Rubinetti AL/23 B717BU

  • Page 1 AL/23 Instructions / Instructions De Montage / Instrucciones ART. B717BU ART. B719BU...
  • Page 2 Installation / Installation / Instalación. Tools needed / Outils nécessaires / Instrumentos necesarias 30 mm 10 mm 12 mm 27 mm TEFLON Index / Index / Índice B717BU B719BU...
  • Page 3 AL/23 1-1/8" B717BU ART. 7/8" 2-1/2 2-1/2 2-1/2 2-1/2" G1/2" 1-3/8" 3-7/8" 3-7/8" 3-7/8" 21" 3-7/8" 3-7/8" 1/2" NPT G 1/2" 1/2" NPT 1/2" NPT 3-7/8" 1-7/8" 3-7/8" 3-7/8" 3-7/8" 3-7/8" 3-7/8" 7/8" B719BU ART. 2-1/2" 2-1/2" 5/8" 2-1/2" 2-1/2" 1-3/8"...
  • Page 4 Installation / Installation / Instalación. Technical data Datos Técnicos Minimum pressure 1 BAR Pression mínima 1 BAR Maximum pressure 10 BAR Pression máxima 10 BAR Reccomended working pressure 2-5 BAR Pression de trabajo aconsejada 2-5 BAR Maximum water temperature 80° Temperatura máxima 80°...
  • Page 5 AL/23 B717BU ART.
  • Page 6 Installation / Installation / Instalación. 30 mm 10 mm...
  • Page 7 AL/23 10 mm...
  • Page 8 Installation / Installation / Instalación. METAL 10 mm 10 mm...
  • Page 9 AL/23...
  • Page 10 Installation / Installation / Instalación.
  • Page 11 AL/23...
  • Page 12 Installation / Installation / Instalación.
  • Page 13 AL/23 2 mm...
  • Page 14 Installation / Installation / Instalación. 10 Nm 27 mm O-ring silicon...
  • Page 15 AL/23 2 mm 12 mm...
  • Page 16 Installation / Installation / Instalación. METAL...
  • Page 17 AL/23 TEFLON 12 mm 2 mm...
  • Page 18 Installation / Installation / Instalación.
  • Page 19 AL/23 ART. B719B...
  • Page 20 Installation / Installation / Instalación. 30 mm 10 mm 10 mm...
  • Page 21 AL/23 10 mm...
  • Page 22 Installation / Installation / Instalación. METAL 10 mm 10 mm...
  • Page 23 AL/23...
  • Page 24 Installation / Installation / Instalación.
  • Page 25 AL/23...
  • Page 26 Installation / Installation / Instalación.
  • Page 27 AL/23 2 mm...
  • Page 28 Installation / Installation / Instalación. 10 Nm 27 mm O-ring silicon...
  • Page 29 AL/23 2 mm...
  • Page 30 Installation / Installation / Instalación. METAL...
  • Page 31 AL/23 TEFLON silicon O-ring...
  • Page 32 Installation / Installation / Instalación. 12 mm...
  • Page 33 AL/23 METAL TEFLON 12 mm...
  • Page 34 Installation / Installation / Instalación. 2 mm...
  • Page 35 AL/23 Use / utilisation / Uso ART. B717BU...
  • Page 36 Use / utilisation / Uso ART. B719BU...
  • Page 37 AL/23 Durante el primer uso o tras un largo periodo de inacti- vidad, no consumir el primer medio litro de agua potable On first use or following prolonged periods of inactivity, do que salga del grifo. Cerrar la instalación de agua si va not use the first half-litre of drinking water dispensed.
  • Page 38 Cleaning / Nettoyage / Limpieza Advice on product care Consejos para el cuidado del producto To clean the surface use a soap and water solution. La limpieza de las superficies se hace utilizando un jabón Never use for any reason cleaning solutions containing liquido diluido en agua.
  • Page 39 AL/23 Note / Note / Nota...
  • Page 40 3-7/8" 3-7/8" 3-7/8" 3-7/8" G 1/2" G 1/2" 1/2" NPT 1/2" NPT R U B I N E T T I Fratelli Fantini SpA via Buonarroti, 4 Pella (NO) Italia T +39 0322 918411 r.a. F +39 0322 969530 fantini@fantini.it Fratelli Fantini SpA via Buonarroti, 4 28010 Pella (NO) Italia...

Ce manuel est également adapté pour:

Al/23 b719bu