Initial start-up
7.1
Procedure for the ASC5000, ASC5000G internal
leak inspection
The internal unit pressure test is performed every day.
 Firstly, the service hose connections to an air conditioning system are
checked and to see whether the service connectors are installed.
 If pressure is still in the hoses, it causes an error and the refrigerant is
drained off. Afterwards, the vacuum test is performed. Several parts
of the unit are evacuated. Once the vacuum test has been carried out
successfully, the parts of the unit are filled with refrigerant – now a
6 minute pressure test is done with all the solenoid valves open to
immediately determine a drop in pressure. After successful comple-
tion, the refrigerant is suctioned off and the unit is available for service
work.
7.2
Setting up and switching on
1. Wheel the AirConServiceCenter to the workplace and lock the front
wheels (9).
I
NOTE
During operation, the unit must be on a level, flat surface so that
measurements can be made correctly.
2. Connect the AirConServiceCenter to the mains.
3. To switch it on, set the main switch (20) to I.
The switch-on delay runs for 35 seconds and the housing is venti-
lated. The software version number then appears in the display (6)
for several seconds:
"SW": Software status
"DB": Database
"SN": Serial number
EN
WAECO INTERNATIONAL
ASC5000
SW
DB
SN
Initial start-up
BML10024
lhd10026
XXXXXX
71