Télécharger Imprimer la page

Cequent Performance Products 66014K Instructions D'installation page 9

Publicité

Les langues disponibles

Les langues disponibles

Before drilling, make sure there are no obstructions in the trailer frame where the intended bolt holes are to be drilled, such as
trailer wiring and/or electric brake breakaway switch.
Directions for installing the rivet nut
Tube Frame
1.
Place the dual cam bracket on the frame at
the correct spot for your installation.
Use the long ½" bolt to clamp the bracket in
2.
position, with C-clamp still in place.
3.
Using the holes in the bracket as a guide,
drill two 7/16" holes into the frame.
4.
Remove the bracket and drill the holes out to
11/16". Do not ream out the hole. This needs
to be a snug fit.
5.
Put the Rivet Nuts into the holes in the
frame.
Rivet
Nut
6.
Place the bracket over the rivet nuts, thread
the ½-13 x 1-1/2 hex head bolts with lock
washers into the holes.
Tighten the long ½" bolt against the frame,
7.
½ turn after contact with the frame.
Tighten the ½" bolts on the outside of the
8.
frame.
9.
Torque to 75 ft. lbs.
©
2014 Cequent Performance Products, Inc.
in a
CAUTION:
Sheet 5 of 33
Rivet nuts
½" hex head bolts with
lock washers
26002IN
10/1/15
Long ½"
bolt
Rev. S

Publicité

loading

Ce manuel est également adapté pour:

61224