Télécharger Imprimer la page

Qlima WDH 235 PTC Manuel D'utilisation page 110

Masquer les pouces Voir aussi pour WDH 235 PTC:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 64
B
INSTALLATION
Corresponding images can be found on pages 254-255.
1.
2.
3.
4.
5.
6.
7.
8.
9.
4
110
This unit must be installed on an external wall, as it vents directly out of its rear. a
Only install the unit on a flat, solid and reliable wall. Ensure that there are no
cables, pipes, steel bars or other obstructions behind the wall.
Leave at least 10 cm of space to the left, right and base of the machine. At
least 20cm of space must be left above the unit to help air flow smoothly.
Paste the supplied installation template paper in position on the wall,
ensuring that the reference line is level using a spirit level. b
The hole for the drainage pipe must be drilled using a 20mm Drill bit. Ensure
the hole is at a downward angle (min 5 degrees) so that the water will drain
correctly. c
Use a 180mm core drill to drill the two holes for the units ventillation,
ensuring that the holes are at a downward angle (min 5 degrees) and aligned
with the template. d
Use the template to mark the position of the screws for the hanging rail,
using a spirit level to ensure it is straight and level.
Drill the marked holes using a suitable 8mm drill bit and insert wall plugs.
Line the hanging rail with the holes, and fix the rail into position using the
supplied screws.
Ensure that the hanging rail is securely fastened onto the wall, and that there
is no risk of the unit tipping or falling.
Roll the plastic vent sheets into a tube and feed them from the inside into the
holes previously made. Ensure the tubes sit flush to the interior wall. e
Go outside and trim off the excess vent tube using a sharp knife, keeping the
edge as neat as possible.
The machine performs best when it is installed on awall with a thickness not
exceeding 240mm.
Insert the indoor fixing ring from the vent cover onto the indoor side of the air
vent. Then fold the external vent cover in half. Attach the chains to each side
of the vent cover, before sliding the cover outside through the vent hole. f
Expand the external cover, before tightly fixing the chains by hooking onto
the indoor fixing ring. This will hold the external cover firmly in position.
Repeat for the second vent. g
Once the chains are fitted and secure, any excess chain should be removed by
cutting the chain. h
Paste the sealing strip in the accessories along the edge of the back for whole
circle of the machine, cut off the excessive length if needed.

Publicité

loading

Ce manuel est également adapté pour:

Wdh 235