Télécharger Imprimer la page

Arrow Storage Products IWC82 Manuel Du Propriétaire Et Guide D'assemblage page 45

Publicité

ANCHORING OPTIONS...
IMPORTANT:
• If you have swing doors, they must hang and swing level before anchoring building.
• Anchor your building at this time. See below for details on anchoring.
• If you have purchased a Floor Frame Kit, you should install it at this time.
• Please take a moment to ensure that the building is installed in accordance
with these instructions and with all applicable regulations.
Anchoring Down The Building
The entire fl oor frame MUST be securely anchored once the building is erected.
Below are recommended ways of anchoring.
Arrow Anchoring Kit:
Recommended for use with any suggested base.
Contains: 4 Anchors with Cable, Clamps and
installation instructions.
Arrow Anchoring Kit:
Recommended for use with the concrete base.
Contains: Corner gussets, perimeter clips, hardware,
1/4" masonry drill bit and installation instructions.
An Anchor Kit may be purchased online at www.arrowsheds.com
You can also purchase one over the phone by calling 1-800-851-1085.
See accessories page for details.
(Model No. AK4 or 60298)
OVER THE BEAMS
AND INTO THE GROUND
(Model No. AK100 or 68383)
Anchoring into Wood/Post:
Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm)
dia. holes provided in the frames for proper anchoring.
1.
Anchoring into Concrete:
1. For poured concrete slab or footing or patio blocks:
Use 1/4" x 2" (6 mm x 51 mm) Lag Screws.
2. For Anchor Post of Concrete poured after building is
erected: Use 1/4" x 6" (6 mm x 152 mm) Lag Screws.
1.
45
2.
2.
43A

Publicité

loading

Ce manuel est également adapté pour:

Iwa82