Télécharger Imprimer la page

Napoleon CONTINENTAL FOYERS CB42NTR Instructions D'installation Et D'opération page 2

Modèle au gaz naturel / propane

Publicité

Les langues disponibles

Les langues disponibles

2
NOTE: The camera icon indicates video tutorials are available as additional reference,
visit http://mynapoleon.napoleonproducts.com/download/index/44/1
EN
1.0
installation overview
2.0
introduction
2.1
2.2
2.3
2.4
3.0
venting
3.1
3.2
3.3
3.3.1 periscope termination
3.3.2 corner termination
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
4.0
installation
4.1
4.1.1 vertical installation
4.1.2 horizontal installation
4.2
4.2.1 horizontal air terminal installation
4.2.2 vertical air terminal installation
4.2.3 appliance vent connection
4.3
4.3.1 horizontal air terminal installation
4.3.2 vertical air terminal installation
4.3.3 restricting vertical vents
4.4
4.5
4.6
4.7
NOTE: Changes, other than editorial, are denoted by a vertical line in the margin.
W415-1541 / C / 11.23.17
table of contents
dimensions
general instructions
general information
rating plate information
venting lengths and components
typical vent installation
special vent installations
minimum air terminal location
clearances
venting application flow chart
definitions
elbow vent length values
top exit vertical termination
rear exit horizontal termination
top and rear exit vertical termination
rear exit
rear exit shield (for rear vent only)
top exit
wall and ceiling protection
using flexible vent components
using rigid vent components
vertical through existing chimney
mobile home installation
gas installation
optional wall switch
3
5.0
framing
4
5.1
minimum framing dimensions
5
5.2
minimum enclosure clearances
6
5.3
non-combustible facing material
7
5.4
alcove clearances
8
5.5
recessed installation
9
5.6
minimum mantel clearances
10
5.7
nailing tab installation
11
6.0
finishing
13
6.1
safety barrier / door removal and
13
installation
13
6.2
front hood installation
6.3
log placement
14
6.4
glowing embers
15
6.5
charcoal embers
15
6.6
logo placement
16
6.7
battery back-up installation
16
6.8
optional (AUB) blower installation
18
7.0
wiring diagram
20
8.0
operation (electronic)
22
9.0
operation (millivolt)
22
10.0
adjustment
23
10.1
pilot burner adjustment
24
10.2
venturi adjustment
24
10.3
flame characteristics
25
10.4
optional anti condensation switch
25
(models CB42NTRE and CB42PTRE only) 53
26
11.0
maintenance
26
11.1
annual maintenance
27
11.2
door glass replacement
28
11.3
care of glass
28
12.0
replacements
28
12.1
overview
29
12.2
electronic valve train assembly
30
12.3
millivolt valve train assembly
31
13.0
accessories
32
14.0
troubleshooting (electronic)
32
33
15.0
troubleshooting (millivolt)
16.0
warranty
33
34
36
40
40
41
42
42
43
43
44
45
46
46
46
47
48
49
50
51
52
52
52
53
54
55
56
56
56
57
58
59
60
61
63
65

Publicité

loading