Télécharger Imprimer la page

probst WEZ-6 Instructions D'emploi page 53

Publicité

Les langues disponibles

Les langues disponibles

Operation
To transport the device without gripping goods, it is done in the "emty stroke position" (see Fig. I).
For this the automatic release (2) must be locked (see Fig. J 1).
This is achieved, when the gripping good is lowered on the ground and the empty device (WEZ) without
gripping good) is lifted.
Lift the device approx. 20 cm from the ground, pull out the spring pin (1) and turn a little at the same
time until it clicks into place (now the device can be transported on the carrier (eg. excavator) - without
the grippers closing accidentally.
As soon as the device comes back to work (ligting of L-stones), the automatic release (2) must first be
unlocked again (→Fig. J 1).
For this the device must be positioned on a level ground!!
Otherwise there is a risk of injury (due to uncontrolled movements of the device)
Pull spring cotter (1) out again and turn by 180 ° (→ Fig. J).
Fig. I
53100375
Fig. J
20 / 25
Fig. J 1
GB

Publicité

loading

Ce manuel est également adapté pour:

53100375