Télécharger Imprimer la page

probst WEZ-6 Instructions D'emploi page 52

Publicité

Les langues disponibles

Les langues disponibles

Operation
Lasthub)
Note when lifting the device (WEZ) with gripping good (L-stone), that the supporting arm (3) does not move
beyond the maximum position (see Fig. H). Otherwise the tension force will be low and the gripping good
(L-stone), could fall down. Danger of accidents!!!
Remedy: move the displaceable rubber gripper (9) inwards (→ Fig. A and B).
53100375
Fig. E1
(Position
Fig. F
19 / 25
Fig. E2
Fig. G
Fig. H
GB

Publicité

loading

Ce manuel est également adapté pour:

53100375