Télécharger Imprimer la page

Weston 03-1100-rt Mode D'emploi page 6

Publicité

Les langues disponibles

Les langues disponibles

assemblY instrUctions
1. Place base on a stable, flat surface.
2. Insert oil pot into base.
3. Align grooves of heating element assembly with
grooves on base. Push down on heating element
assembly to connect it to base.
NOTE: Heater cannot be turned on
unless correctly installed on base. (FIGURE 1)
4. To assemble handle, squeeze tines of handle
together. (FIGURE 2)
5. Align tines with round holes on metal bracket of
basket.
6. Release tines to allow them to spread and then
pull handle back to lock into metal bracket. For
storage: Push handle into basket and squeeze
tines together to remove handle. (FIGURE 3)
7. Align removable vent cover with metal grease
screen and snap into place. (FIGURE 4)
6
fiGUre 1
fiGUre 2
fiGUre 3
fiGUre 4

Publicité

loading