Télécharger Imprimer la page

Tripp-Lite SmartOnline SV Serie Manuel De L'utilisateur page 18

Publicité

Les langues disponibles

Les langues disponibles

7. Installation
7.4 Conduit Box Installation (for Small Frame Models)
1. Remove the terminal block cover located on the top-front of the UPS to access the UPS system's input, output and grounding connection
terminals.
2. The terminal block cover will be replaced with the terminal conduit box found inside the UPS (see illustration).
3. Prepare the terminal box cover with circular cutouts to allow wiring conduits to pass through.
4. Attach the terminal box cover to the top of the UPS system after flexible conduit has been attached.
Notes:
• Make sure the wires are tightly connected to the terminals.
• Cabling should be protected by flexible conduit and routed through the appropriate knockouts in the terminal block cover.
• Conduit box part number: 103509A
Example of conduit
box with circular
cutouts installed
Example of conduit
box located inside
UPS frame
18

Publicité

loading

Ce manuel est également adapté pour:

Smartonline sv20pm