Hardware Installation
Installation Kits Contents
1
6
7
14
12
Suggested Tool Requirements
SCREWDRIVER(Philips and Flatead), RULER, KNIFE, HAMMER, PENCIL, LEVEL
PREPARATION OF CHASSIS
1
Remove the screws which fasten the cabinet at both
sides and at the back.
2
Slide the unit from the cabinet by gripping the base pan
handle and pulling forward while bracing the cabinet.
3
Cut the window sash seal to the proper length.
Peel off the backing and attach the Foam-Seal
underside of the window sash.
4
Remove the backing from the top upper guide Foam-PE
and attach it to the bottom of the Upper Guide.
5
Attach the upper guide onto the top of the cabinet with 3
Type A screws
6
Insert the Frame Guides
cabinet.
7
Insert the Frame Curtain
Frame Guides
8
Fasten the curtains to the unit with 10 Type
A screws
.
16 Room Air Conditioner
2
3
4
5
8
9
10
13
.
into the bottom of the
into the Upper Guide and
.
NO.
1
FRAME CURTAIN
2
SUPPORT BRACKET
3
SILL BRACKET
4
LOCK NUT
5
SCREW (TYPE A)
11
6
SCREW (TYPE B)
7
SCREW (TYPE C)
8
SCREW (TYPE D)
9
CARRIAGE BOLT
10
FOAM STRIP
11
FOAM SEAL
12
WINDOW LOCKING BRACKET
13
DRAIN PIPE
14
FRAME GUIDE
15
15
FOAM-PE
to the
(Type A)
NAME OF PARTS
11
Upper guide
5
14
Q'TY
2
2
2
4
14
7
5
2
2
1
1
1
1
2
1
Shipping
Screws
Upper guide
15
(Type A)
5