Télécharger Imprimer la page

Trevi 250 Instructions D'assemblage page 5

Masquer les pouces Voir aussi pour 250:

Publicité

Les langues disponibles

Les langues disponibles

5
Chart
3,05 m (10')
9,14 m (30')
6
You can now spread approximately 4" (10 cm) of compacting sand
all around the inside base of the wall in order to protect the liner
from the sharp edges of the bottom wall tracks and the stone dust
(if applicable), or install a prefabricated cove if available.
SAND BASE FINISHING
Level finishing sand one last time. Make sure that any sharp stones,
debris or roots have been removed from the surface. For better pro-
tection, spray sand with water and pack it once more until the base
is smooth and even.
7
Before pulling the liner up against the wall, insert a va-cuum cleaner
hose down into the pump return hole to approximately 15 cm (6")
from the ground.
PUMP RETURN HOLE
VACUUM CLEANER
GROUND LEVEL
Maintain the hose in place with adhesive tape. Don't forget to block
the skimmer hole with adhesive tape to prevent air from leaking in.
WALL INSTALLATION (continued)
9,60 m (31' 6")
28,72 m (94' 3")
SAND BASE FINISHING
VINYL LINER INSTALLATION
INNER WALL
15 cm (6")
SAND BOTTOM
2'' (5 cm)
SAND COVE
(or PREFAB COVE)
Place the unfolded liner in the center of the pool area at right angles
with the skimmer hole. Make sure you wear light, flat-soled shoes
to walk on the sand as the slightest heel mark could be visible once
the pool is filled.
Carefully unfold the liner, bringing the bottom-sidewall seam close
to the wall base. Make sure that the side with the protruding seams
faces downward or that the patterned side faces upward.
WALL
12" (
30 cm)
LINER
4'' (10 cm)

Publicité

loading

Ce manuel est également adapté pour:

230248228278280