Installation Type #1 and Type #2
Attention for type #1
If both rough-in outlets are used, you have to install a spout
with diverter. If only the lower rough-in outlet is used, you
have to install a spout without diverter.
Installation
1. Install control unit and secure with screws, see Fig. [5].
2. Close water flow by turning the yoke. The mark (A) must be
on top, see Fig. [6].
3. Open the hot and cold integrated service stops, see Fig. [6].
4. While installation observe the right mounting position.
5. For installation of handle parts after adjustment, see Figs. [7]
and [8].
If the thermostat has been installed at too great a depth,
this can be adjusted by 27mm or 1 1/16" with an extension set
(see Page II, ref. No. 47 822).
5
7
9
English
C
B
Adjustment
Temperature setting, see Fig. [9].
• Before the mixer is put into service, if the mixed water
temperature measured at the point of discharge varies from
the specified temperature set on the thermostat handle.
• After any maintenance operation on the thermostatic
cartridge.
Valve is closed with lever (B) in vertical position:
Open volume control by turning the lever (B).
1. Measure the temperature of the water emerging with a
thermometer.
2. Turn regulation nut (C) until the water emerging has reached
a temperature of 38 °C or 100 °F.
Reversed union (hot on right - cold on left). Replace
thermostatic cartridge, special cartridge for service is:
Ref. No.: 47 175 (1/2").
6
8
A
100 °F
38 °C
4