GB
-Check every pool screws, the corrosion points possible and check the liner is clean before filling the pool.
-The pool water level has always to be hold in a minimum of 15 cm from the pool superior edge. Do not leave the pool without any water.
-Clean regularly the P.V.C liner and the water level mark with non-abrasive products. If you do by accident a small hole in the liner, you can repair it thanks to our rubber patches AR202 and V12.
-Do not jump or walk on the superior edge of the pool.
-You have to use the ladder exclusively to go in or to go out of the pool. (Remove it after use)
-The isothermic covers (for the summer) protect your pool from insects, dust, leaves, ... and avoid to loose the water temperature. Do always set it in order the bubbles are in contact with the water.
-Chimical measures : Please read carefully the chemical product manufacturer instructions. WARNING: Keep chemical products in a clean, dry and out of children place.
Important : Every products used have to be compatible with the P.V.C liner.
-First filling : Analyse the water pH and chlorine (Cl) and adjust them to the optimal levels : pH : 7,2 – 7,6 ; Chlorine : 0.5 – 2 ppm.
-Chlorine treatments : Consist in increasing the chlorine level until approximatively 20ppm to eliminate germs and seaweeds. This process has to be done only
when the pool water comes from rivers or ponds, ... or if it stayed a long time without any treatments.
-Checking : Check at least once a week the chlorine levels (Use a chlorine and pH analyser). In the same way, we advise to add an algicid to prevent seaweeds appearance.
-Warning : Never have a swim before the chlorine level stabilization. Make sure the pool water level is correct.
Do always use a floating dispenser for the chemical product (tablets) dissolution. The chemical product measuring out has to be done in accordance with : Your
pool water volume, the bathe frequency, the climatic conditions, the water temperature and the location. Do always move the water and wait for the chemical product
dissolution before adding another one. Wait approximatively 12 hours between any pH, chlorine or algicid adjustment using the filter system.
-Mechanical measures :Check the filter, the skimmer, the valves and the pipes are well connected to the pool. Switch on the filter system once a day in to insure
a complete water volume renewal and never do it when somebody is in the pool (see filter manual). Do consider high water temperature will involved more time for
the filtering. Theoretic filtering time = Water volume / Filter system discharge (generally 8h/day with water temperature of 21°C), (Ideal : 2h in the morning – 4h around
midday – 2h in the afternoon).
PLEASE RESPECT THE CONTINUOUS WORKING PERIOD INDICATED IN THE FILTER MANUALS
-Bottom cleaner for exhaustion (manual or automatic) : Only for pools with skimmer. Connect an hose extremity to the brush head and immerse it into the
water to make it fill in. Connect the other pipe extremity to the exhaustion adapter (TA) and place it above the skimmer basket. Switch on the filter in the FILTER
position and begin to clean the bottom.
-Bottom cleaner Ventury style : Connect a garden hose to the bottom cleaner join and introduce it into the pool. Open the tap until a normal pressure to make the
water flow out against the bottom of the pool, producing in that way an ascendant stream which leave the dirt into the filter (bag) which is adjust on the bottom cleaner.
PROBLEMS
Cloudy water
Green water
Brown water
Skin and eyes Irritation. Bad smells
WATER CONTROL IMPORTANCE : It's important to do this controls to insure a water quality and the bather security, to prevent infection,
intoxication problems,... due to a bad state of water.
MAINTENANCE AND USE :
CAUSES
Filters deficiencyPH too high
Organic residues excess
Seaweeds and mildew formation
Iron or manganese presence
Unbalanced pH. Organic residues excess
SOLUTIONS
Put back some clean water in the pool, add into the dispenser
flocculant in tablets. Realise a chlorine treatment
Brush carefully the bottom and the steel walls of the pool
Analyse the pH and adjust it Realise a chlorine treatment
Analyse the pH and adjust it Realise a chlorine treatment
Add an algicid and a flocculant
Replace the pool water
a
29