Télécharger Imprimer la page

BWT myPOOL MP-IHP 50 Mode D'emploi page 28

Publicité

Les langues disponibles

Les langues disponibles

c.
Vacuum completely before welding, field welding is not allowed, welding can
only be performed by professional personnel in professional maintenance
center.
d.
Installation must be stopped if any gas leakage, and the unit must be
returned to professional maintenance center.
3. Transportation & Storage
a.
Sealing is not allowed during transportation
b.
Transporting goods at a constant speed is needed to avoid sudden
acceleration or sudden braking, so as to reduce the collision of goods.
c.
The unit must be far away from any source of fire.
d.
Storage place must be bright, wide, open and good ventilation, ventilation
equipment is required.
4. Maintenance Notice
a.
If maintenance or scrap is required, contact an authorized service center
nearby
b.
Qualification requirement
All operators who dispose gas must be qualified by valid certification which
issued by professional agency.
c.
Please strictly comply with the requirement from manufacturer when
maintenance or filling gas. please refer to the technical service manual.

Publicité

loading