Télécharger Imprimer la page

GreenWorks CS24L00 Manuel De L'utilisateur page 11

Publicité

Les langues disponibles

Les langues disponibles

36
37
When the log is held on two ends (37):
1. Cut the first time 1/3 of the diameter from the top (36).
2. Cut the second time lower 2/3 from the bottom to
complete the bucking (35).
39
38
When the log is on a slope:
1. Stand on the uphill side.
2. Control the chainsaw completely.
3. Hold the chainsaw handles tightly.
4. Release the cutting pressure near the end of the cut.
When bucking is complete (38):
1. Wait for the chain to stop (39).
2. Ensure the chainsaw is turned off.
3. Check for hazards before you move to another tree.
10
MAINTENANCE
CAUTION
Do not let brake fluids, gasoline, petroleum-based materials
touch the plastic parts. Chemicals can cause damage to the
plastic, and make the plastic unserviceable.
CAUTION
Do not use strong solvents or detergents on the plastic
housing or components.
English
35
Remove the battery pack from the machine before
maintenance.
10.1
REPLACE THE GUIDE BAR AND
THE CHAIN
1. Loosen the chain cover by turning the chain tension knob
counterclockwise.
2. Remove the chain cover.
3. Put the chain drive links (21) into the bar groove (20).
4. Put the chain cutters (22) in the direction of the chain
operation.
5. Put the chain in position and make sure that the loop is
behind the guide bar.
6. Hold the chain and bar.
7. Put the chain loop around the sprocket (17).
8. Make sure the chain tension pin hole (19) on the guide
bar fits correctly with the bolt (16).
11
WARNING
22
21
20
EN

Publicité

loading

Ce manuel est également adapté pour:

Csg401