REMEMBER
•
Our valves must be installed by professional installers
in accordance with current regulations and recommendations
in your country, and the specifications of the fluid engineer.
•
Sizing the pipes correctly will avoid problems of flow rate, pressure
loss and water hammer (see calculation table in our brochure
and online at www.delabie.com).
•
Protect the installation with filters, water hammer absorbers
and pressure reducers to reduce the frequency of maintenance
(recommended pressure from 1 to 5 bar (100 to 500 kPa) maximum).
•
Install stopcocks close to the valve to facilitate maintenance.
•
The pipework, filters, non-return valves, stopcocks, bib taps, cartridge
and all sanitary fittings should be checked at least once a year,
and more frequently if necessary.
ADJUSTING THE FLOW RATE
• The flow rate is pre-set at the factory at 3 lpm for washbasins, 6 lpm for
shower kits (ref.s fitted with ROUND, TONIC JET or GYM shower heads),
and 9 lpm for shower valves only (without shower heads) and urinal valves.
MAINTENANCE
Beware: do not grease the inside of the mechanism.
• This product has been designed to withstand both thermal and chemical
shocks in line with current regulations.
MAINTENANCE & CLEANING
•
Cleaning chrome, aluminium and stainless steel: do not use
abrasive, chlorine or any other acid-based cleaning products.
Clean with mild soapy water using a cloth or a sponge.
•
Frost protection: drain the pipes and operate the mixer/tap/valve
several times to drain any remaining water.
In the event of prolonged exposure to frost, we recommend taking the
mechanisms apart and storing them indoors.
For the UK market only: Tel. 01491 821 821 - email: technical@delabie.co.uk
The installation guide is available on: www.delabie.co.uk
For all other markets: Tel. +33 (0)3 22 60 22 74 - email: sav@delabie.fr
The installation guide is available on: www.delabie.com
After Sales Care Support: