Télécharger Imprimer la page

Kohler K-475 Guide D'installation page 5

Publicité

Les langues disponibles

Les langues disponibles

1. Prepare the Site — Wall Plate(s)
NOTE: For the glass shelf, do not drill the mounting holes for the
second wall plate until the actual product is measured.
Determine the desired mounting location.
Mark the vertical and horizontal center lines for the accessory to
be installed. Consult the roughing-in diagrams to determine the
dimensions.
When installing multiple-post accessories, measure the accessories
so you can provide the required distance between the center
points.
Use a level to ensure that all center points are level.
2. Mark and Drill the Pilot Holes
Mark the pilot hole locations vertically 9/16" (1.4cm) above and
below the center point or center points.
Vertically line up the holes on each wall plate. Make sure the
larger hole is on the bottom.
If the installation requires multiple posts, confirm that the
centerpoints are even using a level.
NOTE: There is no provision for later adjustment if the center points
and resulting pilot holes for multiple-post accessories are not level.
Select a drill and bit that are appropriate for the wall material
you will be drilling through.
Carefully drill a 5/16" hole at all marked pilot hole locations.
Kohler Co.
All manuals and user guides at all-guides.com
5
1020823-2-A

Publicité

loading

Ce manuel est également adapté pour:

K-476K-477K-478K-480K-482K-485 ... Afficher tout