Télécharger Imprimer la page

Kohler K-2009 Guide D'installation page 3

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com
Preparation (cont.)
Cut out the template where indicated for the countertop opening.
Cut along the inside of the cutting line.
Position the template on the countertop to ensure clearance
between the lavatory, faucet, and backsplash.
Verify cabinet clearance beneath the countertop.
Trace around the template on the countertop with a pencil.
Kohler Co.
3
1018888-2-D

Publicité

loading