LEGRAND Ecotap DC 150 Snellader Manuel page 22

Publicité

Les langues disponibles

Les langues disponibles

19.3 Inserting cable and securing with strain relief
Secure the power cable in the foundation using the cable gland.
Connect the conductors of the cable to the existing main switch terminals (max. 15
to
22Nm
bolt m8 oder 30
to
44Nm bolt s10).
Below is an overview of the wiring diagram
19.4 Load balancer
If you want to install the charging station in combination with a load balancer you must
connect it to the charging station in the following way.
The installation instruction of the charging station in the fuse box can be found in the
manual of the load balancer itself.
The data cable from the load balancer must be connected to the gray clip (see drawing).
Loadbalancing is in devolopment, but not yet possible!
22. www.ecotap.nl