Télécharger Imprimer la page

Kohler K-6269 Guide D'installation Et D'entretien page 2

Robinet de lavabo à montage mural

Publicité

Tools/Outils/Herramientas
Pencil
Crayon
Lápiz
Propane Torch
Torche au propane
Soplete de propano
Plumbers Putty
Solder
Mastic de plombier
Fer à souder
Masilla de plomería
Suelda
#10 Wood Screws
Level
Vis à bois #10
Niveau à bulle
Tornillos para madera
Nivel
del #10
Before You Begin
CAUTION: Risk of property damage. Before finishing the wall, ensure the supply
lines are connected to the mixer valve with the cold supply line plumbed on the
left and the hot supply line plumbed on the right. Doing so will avoid replacing
the finished wall due to error.
NOTICE: For exterior wall installations, be sure proper wall insulation is installed to
prevent frozen pipes.
Observe all local plumbing and building codes.
Shut off the main water supply.
Carefully inspect supply tubing for any sign of damage.
The supplied plaster guard will also be used to assemble the valve. The supplied
spout tool will also be used for alignment of the handle.
Kohler Co. reserves the right to make revisions in the design of faucets without
notice, as specified in the Price Book.
Avant de commencer
ATTENTION: Risque d'endommagement du matériel. Avant de terminer le mur,
s'assurer que les conduites d'alimentation sont connectées au robinet mélangeur
avec la conduite d'alimentation en eau froide plombée sur la gauche et la conduite
d'alimentation en eau chaude plombée sur la droite. Ceci permettra d'éviter de
remplacer le mur fini en raison d'une erreur.
1141147-2-A
Hex Wrenches
Tube Cutter
Clés hexagonales
Coupe-tubes
Llaves hexagonales
Cortatubos
1-3/16" and 2-3/16" Hole Saw
Scie circulaire de 1- 3/16" et 2-3/16"
Corona perforadora de 1-3/16" y 2-3/16"
2x4 Lumber
Tape Measure
Lambourde de 2x4
Mètre ruban
Cinta para medir
Listones de 2x4
2
Kohler Co.

Publicité

loading