Télécharger Imprimer la page

DVP LC.2 Instructions D'utilisation Et D'entretien page 18

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7
HOW TO RETURN THE PUMP
The product may only be returned after prior agreement with the supplier, who will provide the authorisation number
that must accompany the material delivered and should be duly complete in its entirety.
8
DISMANTLING
Demolition of the pump must be performed by authorised technicians.
Metal parts can be disposed of as scrap metal.
All materials deriving from demolition must be disposed of according to regulations in the country where the pump
will be demolished.
HAZARD
Disposal operations involve risks of cutting, shavings protection, entanglement, contact with
moving parts and contact with chemicals. Operators should use the appropriate personal
protective equipment.
8702036 – 12/04/2016 – R.7
Operating and Maintenance Instructions
LC.2 – LC.4 – LB.5 – LB.6 – LB.8 – LC.12 – LC.20
17
EN
www.dvp.it

Publicité

loading

Ce manuel est également adapté pour:

Lc.4Lb.5Lb.6Lb.8Lc.12Lc.20